Subscribe to N6408C Bearhawk 4 Place Builders Log

Wednesday, December 19, 2018

Tunnel "Fairing"

Some of the RV builders claim that airflow through the cowling can be improved with a curved piece at the tunnel.  I call it a Tunnel Fairing.  IDK...

.032 aluminum screwed to a 1 1/2" PVC pipe.



Completed



Friday, December 14, 2018

ELT


Mounting the ACK E-04 406 Mhz ELT is pretty straight forward.  I installed an aluminum tray on the existing frame tabs.  Then set the provided bracket and straps that comes with the ACK E-04.  So four holes through the bracket and the tray with four AN-3 bolts to secure it in place.



Wednesday, December 12, 2018

Sheet Metal Under the Doors


Because I raised the door thresholds for the gull wing doors, I needed to fabricate some additional aluminum panels.  The AviPro Bearhawk kit also comes with aluminum threshold caps that I modified to serve as wear plates.  Those are typically fabric covered.   This section will have three panels assembled with #6 button head screws and nut plates.  This will allow access for inspection and maintenance of the fuel lines.